AI Risk Register & Treatment Tracking

This tool grades whether each entry in your AI risk register is governed enough to be defensible. It scores 6 weighted controls into a 0–100 number — then a gate that can only make the verdict worse.

The 6 weighted controls

01Likelihood ratedwt 12
02Impact ratedwt 12
03Treatment decidedwt 20
04Owner namedno ownerwt 22
05Residual ratedwt 18
06Review currentwt 16
GOVERNED
score 75+
GAP
score 45+
UNGOVERNED
below floor
Accepted-high-residual gate · worsen-only

A risk you accept, at high residual severity, with no named owner (or an overdue review) is UNGOVERNED — regardless of the score.

78/100
UNGOVERNED

Why: Entry R-03 is an accepted, high-residual risk that scores well on paper — but nobody owns it, so the register isn't defensible.

Fix firstName an owner for the accepted high-residual risk

A high score didn’t save it. The score is context; the gate is the answer — and where something is short, the fix first row names it. A working aid for grading a risk register — not a risk assessment, certification, or legal advice.